Installer & Trade Resources
Planning resources for better handoffs
Installer & Trade Resource Center
Use these worksheets to organize loads, models, site constraints, and open questions before product selection or an installer consultation.
Downloadable planning packet
Worksheet
Power-system sizing worksheet
Record critical loads, running watts, startup loads, coverage hours, battery reserve, inverter assumptions, solar goals, and open model questions.
Open the worksheetChecklist
Pre-installation handoff checklist
Organize exact model documents, electrical and mechanical constraints, protection questions, environmental conditions, and responsibility handoffs.
Open the checklistInteractive planning tools
What to send for a useful product-fit review
Technical reading paths
On smaller screens, swipe or scroll to see all columns.
| Decision | Start here | Then verify |
|---|---|---|
| Home battery capacity | Home backup sizing guide | Measured loads, reserve, current, surge, inverter and transfer requirements |
| 48V rack battery | Server-rack battery guide | Exact manual, rack fit, communications, busbars, cables, protection |
| Hybrid inverter voltage | 24V vs 48V guide | Battery platform, PV window, AC topology, neutral/grounding, permits |
| RV solar kit | RV solar sizing guide | Roof layout, shading, controller limits, cable routing, mounting and weather sealing |
Send the worksheet with the exact model numbers
For product and order questions, contact Torven Power Monday–Saturday, 8:00 AM–8:00 PM Eastern Time.